PED CONCEPTS, the Prime, and sub-contractors conducted a visual survey of the Ellis Island storm drainage system (civil engineer), existing land, and the Liberty Island land (arborist). The information gathered was incorporated into all aspects of the proposed repair work. Our Team’s survey took into consideration, the management and maintenance of traffic from the ferry dock terminal and immediate areas of the project site. This was achieved by working with NPS facility operations to minimize possible interference with the normal operations of the working areas and of park operations. The work included but was limited to Historical paver repairs, Sod Removal/Replacement, fencing and Porte Cohere gate, tree pruning, tree replacement, and soil amendments.
Project Details
Client: Ellis Island
Agency: National Park Service
Project Value: $4,100,000